Training

MAPFRE Road Safety Experimentation Center

Inicio » Training » On-site training » Blurring techniques and partial painting
Blurring techniques and partial painting

Advanced

Aimed at professionals in the painting area who wish to study in depth the different methods, equipment and products used in vehicle painting operations.

Employability: You will become an expert in the application of blurring as a fundamental tool for matching colors and achieving imperceptible repairs. You will apply partial paints depending on the support and the configuration of the area, including three-layer finishes.

Contents:

  1. Blurred with 2K paint in whole piece.
  2. Partial smudging with 2K paint on one piece.
  3. Color fade in two-layer finishes.
  4. Complete blending of varnish in two-coat and three-coat finishes.
  5. Partial blending of varnish in two-coat and three-coat finishes.
  6. Blur on the same part to be repaired.
  7. Smudged on adjacent part or pieces.

Duration: 12 hours (2 days)

Related courses

Paint damage assessment

Paint damage assessment

Length: 12 hours (2 days) 

On-site

Painting practical course

Painting practical course

Length: 3 days (16 hours)

Training: On-site

Surface preparation

Surface preparation

Length: 1 day (6 hours )

Training: On-site

Finish application

Finish application

Length: 1 days (6 hours )

Training: On-site

Color interpretation and color search kits

Color interpretation and color search kits

Length: 1 day ( 6 hours )

On-site

Application of three-layer finishes

Application of three-layer finishes

Length: 1 day ( 6 hours )

On-site

Blurring techniques and partial painting

Blurring techniques and partial painting

Length: 2 days ( 12 hours )

On-site

Detection and removal of paint damage and defects

Detection and removal of paint damage and defects

Length: 2 days ( 12 hours )

On-site

Painted thermoplastics

Painted thermoplastics

Length: 1 day ( 6 hours )

Training: On-site

Motorcycle painting

Motorcycle painting

Length: 1 day ( 6 hours )

On-site

Truck and bus painting

Truck and bus painting

Length: 1 day ( 6 hours )

On-site