Learning

MAPFRE Road Safety Experimentation Center

Inicio » Training » On-site training » Finish application
Finish application

Specialization

Aimed at professionals in the painting area who wish to study in depth the different methods, equipment and products used in vehicle painting operations. span>

Employability: We will comprehensively address the surface beautification process to be able to apply the appropriate process and determine the methods, related to the different types of surfaces and coating materials.
You will formulate adjusted mixtures, selecting the appropriate products (basic colors, catalysts and diluents). You will adjust the color and apply it, depending on the finish and coating of the support, plastic or metallic

Contents:

  1. Painting tools and equipment. Guns for specific products and spectrophotometers.
  2. Execution of painting processes.
  3. Water-based products, UV varnishes, varnishes with moisture.
  4. Large surface painting.

Duration: 6 hours (1 day)

Related courses

Paint damage assessment

Paint damage assessment

Length: 12 hours (2 days) 

On-site

Painting practical course

Painting practical course

Length: 3 days (16 hours)

Training: On-site

Surface preparation

Surface preparation

Length: 1 day (6 hours )

Training: On-site

Finish application

Finish application

Length: 1 days (6 hours )

Training: On-site

Color interpretation and color search kits

Color interpretation and color search kits

Length: 1 day ( 6 hours )

On-site

Application of three-layer finishes

Application of three-layer finishes

Length: 1 day ( 6 hours )

On-site

Blurring techniques and partial painting

Blurring techniques and partial painting

Length: 2 days ( 12 hours )

On-site

Detection and removal of paint damage and defects

Detection and removal of paint damage and defects

Length: 2 days ( 12 hours )

On-site

Painted thermoplastics

Painted thermoplastics

Length: 1 day ( 6 hours )

Training: On-site

Motorcycle painting

Motorcycle painting

Length: 1 day ( 6 hours )

On-site

Truck and bus painting

Truck and bus painting

Length: 1 day ( 6 hours )

On-site