Learning

MAPFRE Road Safety Experimentation Center

Inicio » Training » On-site training » Paint damage assessment
Paint damage assessment

Specialization

Aimed at receptionists, service advisers and responsible for Bodywork and Painting.

Employability: The management of the painting area must be approached with full knowledge of the equipment and products, but also of the assessment tools that are available to the professional. An adequate assessment of the damages that the vehicle presents is the first step to optimize the operation of the workshop. You will learn to handle current paint estimation systems and to assess damage from the moment the vehicle enters the workshop.

Contenidos:

  1. Management elements.
  2. Systems for assessing painting jobs.
  3. Current paint estimation systems (scales, rates and cost per piece).
  4. CESVIMAP paint scale. Particularities, levels, metal and plastic parts. Assessment of scratches and alloy wheels.

Length: 12 hours (2 days)

Related courses

Paint damage assessment

Paint damage assessment

Length: 12 hours (2 days) 

On-site

Painting practical course

Painting practical course

Length: 3 days (16 hours)

Training: On-site

Surface preparation

Surface preparation

Length: 1 day (6 hours )

Training: On-site

Finish application

Finish application

Length: 1 days (6 hours )

Training: On-site

Color interpretation and color search kits

Color interpretation and color search kits

Length: 1 day ( 6 hours )

On-site

Application of three-layer finishes

Application of three-layer finishes

Length: 1 day ( 6 hours )

On-site

Blurring techniques and partial painting

Blurring techniques and partial painting

Length: 2 days ( 12 hours )

On-site

Detection and removal of paint damage and defects

Detection and removal of paint damage and defects

Length: 2 days ( 12 hours )

On-site

Painted thermoplastics

Painted thermoplastics

Length: 1 day ( 6 hours )

Training: On-site

Motorcycle painting

Motorcycle painting

Length: 1 day ( 6 hours )

On-site

Truck and bus painting

Truck and bus painting

Length: 1 day ( 6 hours )

On-site